Building under repair
![2 2](https://www.iccplindia.com/wp-content/uploads/2016/09/2-5-217x163.jpg)
Corrosion of steel resulting in partial collapse of slab
![3 3](https://www.iccplindia.com/wp-content/uploads/2016/09/3-5-217x163.jpg)
Corrosion of steel resulting in delamination of concrete cover
![4 4](https://www.iccplindia.com/wp-content/uploads/2016/09/4-5-217x163.jpg)
Slabs and beams after repair
Make OR Break Factor
No structural drawings or details were available and the building was on a main road, making passerby safety extremely risky but equally important.
THE CHALLENGE :
- A mixed-use complex was suffering water leakage in the terrace slab, that had further snowballed into steel corrosion, concrete de-lamination and reduction in reinforcement size.
THE ODDS :
- Certain portions of the slab had already collapsed due to heavy corrosion.
- Care had to be taken regarding building and occupant safety, while restoring the remaining portion
OUR RESPONSE :
- Due to unavailability of original structural drawings, the structural details were re-analyzed
- The structural shortfall was analyzed as per the prevailing code
- Curative measures were taken for corrosion, while the damaged concrete sections were patched up and the structural elements externally reinforced